Active Rutland Hub

Active Rutland Hub

 

START DATE: NOVEMBER 2014

END DATE: APRIL 2015

CONTRACT VALUE: £152,000.00

PACKAGE: ELECTRICAL & MECHANICAL

LOCATION: RUTLAND

Project Description

Active Rutland Hub was a 17 week EMPA project for the conversion of run down prison facilities into new offices and sports facilities as part of a new development within Oakham Business Park. Working alongside the main contractor and we have successfully completed a Mechanical and Electrical Design and Build package for £152,000.00 to include the following:

  • Fire Alarm installation and commissioning
  • Intruder Alarm installation and commissioning
  • Data Cabling
  • Installation of main distribution boards and sub mains
  • Power Installation
  • Lighting Installation
  • Supply wire and fit water heaters
  • Ventilation
  • Hand Dryers
  • Inside lighting throughout entire building
  • Outside lighting, lamp posts and flood lights
  • Electric doors
  • Sockets and switches internal and external
  • Electrical supplies to signage
  • Disabled Alarms in toilet
  • Drawings & O&M Manuals
  • Mechanical works
  • Sports Hall Lighting

This Contract was completed with no M&E snags and within budget.